Urgently required - 12 Pipefitters 

My Client requires a number of experienced offshore Pipefitters to complete a Shutdown project in West Africa - late October 2019

2-3 weeks work with everything provided 

Candidates with previous working experience and valid offshore certs for this short term project are required 

Preparation for fit up grinding and cutting with bevel.

Layout and cut pipe spool minus the take off 90 deg. 45 deg. And special take off.

Layout and fit-up carbon steel and stainless steel or alloy steel based on construction drawings.

Set-up and purge stainless steel pipe.

Fabricate pipe spool elbow; flange all kinds of fitting accordance as per drawing.

Study the procedure of the given test package, punch list.

Check the location or area according to isometric drawing and follow the category I.

Check and repair the pipe spool and elbow out of levelness and squareness.

Check the isometric drawing and the area according to the test limit of hydro testing.

Fabrication and installation of pipe supports. Installation of vent and drain as per drawing given by the foreman installation of spectacle and blind flange for the preparation of hydro-testing.

Find the higher elevation of the test limit that where install one of the pressure gage.

Blind the by pass, if not according to the hydro test limit.

Prepare hose manifold, hydraulic pump and water pump.

Find the lower elevation like drain where in connect slip blind, and hose going to the manifold where in connect pressure gage and relief valve.

Connect valve hose going to tank water and ready for the water filling before the test pressure.

Prepare hose manifold, hydraulic pump and water pump.

Tighten all connection valves, flanges, plug and open vent if there is needed.

Erection and fit up of 60" pipe to slipper way area going to burn fit area.

Fabrication and installation of pipe supports. Installation of vent and drain as per drawing given by the foreman installation of spectacle and blind flange for the preparation of hydro-testing.

Layout and fabricate rolling offset.

Set-up and purge stainless steel pipe.

Compute the traveler. Takes of long radius and short radius special take off.

Install flange and valve.

House keeping everyday.

Install flow meter installation flange and valve and repair and assemble gate valve manifold check valve etc. fit up and pipe support pipe and shoe with asbestos installation and bolting 20" gate valve.

Layout and cutting lateral 45 degree and saddle tee.

Fabricate and installation and using purging paper and purging block argon etc.

House keeping everyday.