PSA Investigates Serious Lifting Incident on Deepsea Atlantic



An investigation has been launched by the Petroleum Safety Authority Norway (PSA) into a serious incident which occurred on the Deepsea Atlantic drilling rig on August 10.

During lifting, a length of conductor casing weighing roughly seven tonnes fell about six meters onto the catwalk. One person was standing on the drill floor about six meters away, but nobody was injured.

This incident occurred at 21.25 while the rig, which is operated by Odfjell Drilling AS, was working for StatoilHydro on the Gullfaks South field. The PSA was notified at 22.10.

The elevator opened while lifting the first length of 30-inch casing from its horizontal position on the catwalk to vertical, causing the top end of the pipe to fall.

Since the bottom end of the casing had not lifted clear when the incident occurred, the measured weight on the lifting block at that point was three tonnes. The operation immediately ceased.

The PSA has appointed a three-member investigation team which travelled out to Deepsea Atlantic on August 11. Its attention will be primarily focused on drilling contractor Odfjell Drilling.

Aims of this investigation include clarifying the sequence of events and identifying direct and underlying causes. The work will lead to a report, which will be published on the PSA website.
 


RELATED COMPANIES
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.