StatoilHydro Resumes Production at Visund and Oseberg South

StatoilHydro

StatoilHydro says production on both Visund and Oseberg South has resumed after the temporary halt caused by the severe weather on November 9th.

Production on Visund was restarted during the night before, and Oseberg South resumed its production on Friday afternoon.

The extreme weather has not caused any harm to personnel or property on StatoilHydro's installations.


Most Popular Articles