Mosaic Expects Hurricane-2 to Spud Early Next Week



Mosaic Oil NL said that the Premium Wilcraft jack-up rig, operated by Santos, is being mobilized to the Hurricane-2 drilling location. The well is expected to be spudded on or around the June 25, 2007, and is expected to take 20 days to drill.

Hurricane, situated in the eastern part of WA-208P, is a large fan play with the potential to contain 40-50 million barrels of recoverable oil.

The Hurricane-1 gas discovery, drilled in 2005, intersected a 76 m gross gas column on rock with no gas-water or gas-oil contact identified. Supporting pressure and gas/condensate compositional data indicate the likelihood of there being an underlying oil leg. Hurricane-2 will target this interpreted oil leg at a location downdip from the Hurricane-1 well.

Mosaic Oil has a 6% interest in WA-208P.

RELATED COMPANIES
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.