Sevan Pulls Out BOP for Repairs



Following attempts to release the locked ram at the seabed, Sevan has, in accordance with procedures, decided to pull the BOP to the surface for repair of the jammed ram. Preparations for the pulling operations are ongoing. Estimated total downtime since the semisub Sevan Driller came off hire, on November 2, is about 20 days.
 


RELATED COMPANIES
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.