Sevan Driller Currently Off-Hire



The Sevan Driller is currently off-hire due to problems with the blow-out preventer (BOP) which started on November 2. During routine testing of the BOP, the locking system of one of the rams jammed in locked position. We are working together with Petrobras and the supplier, Cameron, to find a solution to the problem. If a solution is not found, the BOP must be pulled to the surface and repaired.


RELATED COMPANIES
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.