SEARCH JOBS >>

EQUIPMENT LISTING DETAILS

NOV Pipe Racking Lift Arm, SWL 10 Te

Equipment Description

Pipe and casing handling system, NOV Pipe Racking Lift Arm, SWL 10 Te - New / Unused

The Racking Lift Arm is designed to guide drill collars between the fingerboards setback and set off point and vice versa. The Racking Lift Arm is a trolley mounted telescopic box construction. The trolley runs on a guide beam assembly; arranged in the derrick between drill pipe stands racked in the fingerboard.

The Racking Lift Arm consists of 9 main items
1. Derrick Guide Beam Assembly
2. Trolley
3. Slewing king
4. Telescopic Box Arm
5. Vertical Guide
6. Racking Lift Head
7. Standlift arrangement
8. Control valve Unit
9. PLC control cabinet

CLICK HERE for more information and pictures on our website.

Equipment Gallery

FEATURED COMPANIES