EQUIPMENT LISTING DETAILS
National 12P-160 Mud Pump (4 Available)
Equipment Description
Refurbishment process includes:
- Complete Disassembly
- Sandblast all Components (Protecting Machined Surfaces)
- Dimensional/Condition Inspection of all Components
- Mag-Particle Inspection of all Load-Bearing Components
- Reassembly with new Bearings, Sealing Components, and Hardware
- Factory Acceptance test
- Three-Coat Offshore Paint System Included
- Pump can be provided with or without Fluid-End Modules
- Top-Mount or Rear-Mount Unitization with Drive Motors and Belts is available upon request
Equipment Gallery
×