LATEST JOB POSTINGSLATEST JOB POSTINGS

41 - 60 of 136 Jobs

Operador de Unidades Móviles (Ingeniero de U. M- Lazaro)

Veolia Water Technologies & Solutions
Lázaro Cárdenas, Mich., Mexico

Perform physicochemical analysis Perform cartridge changes. Connect air lines. Monitoring and supervision of the osmosis process. Start and purge the Plant equipment. Sludge management. Cleaning the work ...

Chemical Engineering Environmental Engineer

Automation Engineer

Saipem Featured Employer Featured Employer
United Arab Emirates

are done in full compliance with the HSE requirements Acknowledge the involvement of its job role in the PTW system and verifies the safety measures described in the PTW for its job role involvement, ...

5 + Years Experience Instrument & Controls Engineer

Electrical Engineer

Saudi Aramco (ASC) Featured Employer Featured Employer
Saudi Arabia

the successful candidate you will be required to perform the following: Assess plant power systems and substations, and recommend new installations or modifications to improve power system reliability ...

10 + Years Experience Electrical Engineering

Grid Connection Engineer

Siemens Gamesa
Melbourne, VI, Australia

required to progress Projects through the complete cycle of regulatory processes as related to Grid Connection required anywhere in APAC region. The Grid Connection Engineer will work in conjunction with ...

1 + Years Experience Electrical Engineering