and for the preparation of the general HSE plan. Ensures that all activities within his area of responsibilities are done in full compliance with the HSE requirements. Actively contributes to Safety Walk ...
LATEST JOB POSTINGS
SORT BY
21 - 40 of 134 Jobs
Senior Project Engineer
Veolia Water Technologies & SolutionsSan Jose, CA, United States
Commission electrical and mechanical distribution equipment in a variety of environments, including:Mission critical facilities (e.g. data centers)Central boiler and chiller plantsSmall power generation ...
Service Supervisor - Pipeline & Process Services
Halliburton
Stavanger, Rogaland, Norway
Work as a Supervisor or Field Engineer Perform and lead field operations on projects within pipeline commissioning and maintenance services, and within process services, including rig up/rig down and ...
a successful candidate you will be required to perform the following: Implementation of safety instrumented system (SIS), supervisory control and data acquisition (SCADA), distributed control system (DCS), ...