We are looking for the right people - people who want to innovate, achieve, grow and lead. We attract and retain the best talent by investing in our employees and empowering them to develop themselves ...
LATEST JOB POSTINGS
SORT BY
- Sort by Relevance✔
- Sort by Date
341 - 344 of 344 Jobs
R&D Electrical Engineer
HalliburtonRJ, RJ, Brazil
Heavy Lift Crane Operator & Crane Operator
Sapura Drilling Services Sdn BhdKuala Lumpur, Malaysia
The Heavy Lift Crane Operator is the designated "person in charge" for all crane operations. His primary roles is to assist the Barge Engineer (Master) in all deck and marine operations in support ...
Offshore Installation Manager
Sapura Drilling Services Sdn BhdKuala Lumpur, Malaysia
The Offshore Installation Manager (OIM) is responsible for the day-to-day management, operation & maintenance of the offshore installation and in charge of the health, safety and welfare of persons on ...
Driller
Sapura Drilling Services Sdn BhdKuala Lumpur, Malaysia
The Driller is the designated "person in charge" of real time drilling operations ensuring the safety of the drill crew and support personnel working around the drill floor. This includes monitoring ...