LATEST JOB POSTINGSLATEST JOB POSTINGS

SORT BY sort by
  • Sort by Relevance
  • Sort by Date
1 - 11 of 11 Jobs

Design Drafter

Targa Resources Inc
Watford City, ND, United States

Create and maintain Piping & Instrument Diagrams 3D Piping Models Plot Plans & General Arrangement Drawings MINIMUM ESSENTIAL QUALIFICATIONS: Minimum of 2 years of related work experience. Minimum High ...

2 + Years Experience Drafting

Pipeline Technician

Targa Resources Inc
Watford City, ND, United States

Pigging Operations, along with proper documentationMaintain and operate pickup and equipment for piggingSite cleanup and maintenanceAssisting other field operators when necessary where neededMOC's, Recognition ...

0 + Years Experience Pipeline Operator

Developmental Technician

Targa Resources Inc
Watford City, ND, United States

Acquire necessary skills to fill out applicable work/hot work permits, lockout/tagout documentation, attend and participate in tailgate sessions with others involved in work site activities Assist with ...

0 + Years Experience Maintenance Technician

Plant Operations Technician

Targa Resources Inc
Watford City, ND, United States

Review and monitor plant operation/processes for optimizing quality and production of products meeting required data specifications, including but not limited to working safely and having good trouble ...

2 + Years Experience Plant Operations Engineer Refinery / Plant Operator

Operations Supervisor

Targa Resources Inc
Watford City, ND, United States

Must be able to perform functions as outlined below: Provides training and coaching to all employees located within the plant. Ensures a safe work environment for supervised staff by promoting safety ...

0 + Years Experience Operations Management

ES&H Supervisor

Targa Resources Inc
Watford City, ND, United States

Management and development of Safety and ES&H Specialists and/or other ES&H Personnel. Ensures compliance with applicable OSHA, PHMSA, EPA, TCEQ, Federal, State, and Local Requirements. Ensures that new ...

5 + Years Experience HSE Manager / Advisor

Maintenance Technician

Targa Resources Inc
Watford City, ND, United States

Adjust process variable and conditions using a GE PLC / Wonderware system Experience using analytical instruments and tools to diagnose and troubleshoot malfunctions of equipment listed above Experience ...

1 + Years Experience Maintenance Technician

Measurement Technician

Targa Resources Inc
Watford City, ND, United States

Assists with repairing and/or replacing faulty instruments, safety equipment and controls, and maintains instruments and control equipment in a clean and workable condition Audits meter stations for installation ...

1 + Years Experience Maintenance Technician MWD / LWD

Maintenance Technician

Targa Resources Inc
Watford City, ND, United States

Adjust process variable and conditions using a GE PLC / Wonderware systemExperience using analytical instruments and tools to diagnose and troubleshoot malfunctions of equipment listed aboveExperience ...

0 + Years Experience Maintenance Technician

Field Operations Technician

Targa Resources Inc
Watford City, ND, United States

Adhere to all Targa HSE requirements, with safety and environmental being at the forefront of all operations Complete all necessary paperwork and documentation (MAXIMO) Starting and stopping of all station ...

0 + Years Experience Field Service Tech

Terminal Operations Technician

Targa Resources Inc
Watford City, ND, United States

Possess general knowledge of pumps and associated equipment for pipeline operations Take oil samples and perform routine grind outs to measure sediment and water content and determine quality Perform ...

2 + Years Experience Oil Terminal / Storage Management Refinery / Plant Operator