LATEST JOB POSTINGSLATEST JOB POSTINGS

SORT BY sort by
  • Sort by Relevance
  • Sort by Date
1 - 2 of 2 Jobs

Gas Turbine Specialist (Operation & Maintenance)

Opulent Projects United Featured Employer Featured Employer
Tripoli, TR, Libya

required in the installation, inspection and maintenance of Gas Turbine and auxiliary equipment and Power Plant auxiliary equipment such as Switch Gears and Transformers. A significant portion of the ...

15 + Years Experience Field Service Tech

Gas Turbine Specialist (Operation & Maintenance)

Opulunt Projects United Featured Employer Featured Employer
Tripoli, TR, Libya

required in the installation, inspection and maintenance of Gas Turbine and auxiliary equipment and Power Plant auxiliary equipment such as Switch Gears and Transformers. A significant portion of the ...

15 + Years Experience Maintenance Engineer