LATEST JOB POSTINGSLATEST JOB POSTINGS

SORT BY sort by
  • Sort by Relevance
  • Sort by Date
1 - 19 of 19 Jobs

Planner/Scheduler

Targa Resources Inc
Mont Belvieu, TX, United States

Helping to prioritize, plan and schedule maintenance work while verifying accuracy of job plans Primary focus is to move into a proactive and predictive mode optimizing work force productivity and minimize ...

0 + Years Experience Planner / Scheduler

Operations Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Conduct all job related tasks in a safe manner; comply with all governmental and corporate regulations (including site-specific procedures) related to occupational safety, employee health and the environment. ...

3 + Years Experience Refinery / Plant Operations Supervisor

I/E Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Installation, maintenance and calibration of temperature, differential, pressure, level and vibration transmittersMaintenance and installation of various brands of control valves including AOV’sMonitor ...

5 + Years Experience Electrical Technician Instrumentation Technician

Rotating Maintenance Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Maintain Pumps, steam turbines, reciprocating and centrifugal compressors, all rotating equipment Gear boxes, cooling fans, couplings, Maintain company vehicles, assist Operations in locking out equipment ...

3 + Years Experience Maintenance Technician

Rotating Maintenance Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Maintain Pumps, steam turbines, reciprocating and centrifugal compressors, all rotating equipment Gear boxes, cooling fans, couplings, Maintain company vehicles, assist Operations in locking out equipment ...

3 + Years Experience Maintenance Technician

I/E Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Installation, maintenance and calibration of temperature, differential, pressure, level and vibration transmittersMaintenance and installation of various brands of control valves including AOV’sMonitor ...

5 + Years Experience Electrical Technician

Operations Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Conduct all job related tasks in a safe manner; comply with all governmental and corporate regulations (including site-specific procedures) related to occupational safety, employee health and the environment. ...

3 + Years Experience Operations Management

Plant Administrator

Targa Resources Inc
Mont Belvieu, TX, United States

Answer telephones, greet visitors at lobby entrance, communicate with plant personnel via radio Responsible for general correspondence - reporting, general filing, scheduling meeting rooms, etc. Payroll ...

0 + Years Experience Refinery / Plant Operator Refinery Specialist Refinery Staff

Rotating Maintenance Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Maintain Pumps, steam turbines, reciprocating and centrifugal compressors, all rotating equipment Gear boxes, cooling fans, couplings, Maintain company vehicles, assist Operations in locking out equipment ...

3 + Years Experience Maintenance Technician

Operations Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Conduct all job related tasks in a safe manner; comply with all governmental and corporate regulations (including site-specific procedures) related to occupational safety, employee health and the environment. ...

3 + Years Experience Operations Management

Operations Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Conduct all job related tasks in a safe manner; comply with all governmental and corporate regulations (including site-specific procedures) related to occupational safety, employee health and the environment. ...

3 + Years Experience Operations Management

NGL Corrosion Technician

Targa Resources Inc
Mont Belvieu, TX, United States

include, but are not limited to, gathering annual pipe-to-soil survey data; gathering rectifier readings and troubleshooting rectifier units; performing interference testing; and designing, overseeing ...

0 + Years Experience Corrosion Engineering

Analyzer Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Installation, maintenance and calibration of on stream gas chromatographs Installation, maintenance and calibration of various utility analyzers including conductivity, PH, moisture, 02, BTU and CO Maintain ...

1 + Years Experience QA / QC / Inspection

Analyzer Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Installation, maintenance and calibration of on stream gas chromatographs Installation, maintenance and calibration of various utility analyzers including conductivity, PH, moisture, 02, BTU and CO Maintain ...

1 + Years Experience Field Comm / SCADA Maintenance Technician

Planner-Scheduler/Warehouse Agent

Targa Resources Inc
Mont Belvieu, TX, United States

Serve as primary point of contact for coordinating purchases of goods and services. Coordinate with end users to indentify & specify requirements and select the appropriate sourcing strategy for the purchase ...

2 + Years Experience Planner / Scheduler Warehouse Person

Maintenance Technician

Targa Resources Inc
Mont Belvieu, TX, United States

General maintenance at MBC Maintain good housekeeping â€" maintain area including trash, and all cast off material Operates equipment such as carry deck, forklift, scissor lift Completes basic and routine ...

0 + Years Experience Maintenance Technician

NGL Pipeline Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Train and Obtain DOT qualifications to perform certain DOT pipeline tasks Perform routine field startup/shutdown of pipeline facility equipment Recognize pipeline and pipeline equipment malfunctions Recognize ...

0 + Years Experience Pipeline Operator

Terminal Operations Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Conduct all job related tasks in a safe manner; comply with all governmental and corporate regulations (including site-specific procedures) related to occupational safety, employee health and the environment. ...

0 + Years Experience LNG Oil Terminal / Storage Management

DCS PLC Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Support process DCS and PLC systems which includes controls, metering, alarms, automation and communications Troubleshooting, installation, modification and maintenance of DCSs, PLCs and other network ...

5 + Years Experience Instrument & Controls Engineer Process Control