LATEST JOB POSTINGSLATEST JOB POSTINGS

SORT BY sort by
  • Sort by Relevance
  • Sort by Date
1 - 9 of 9 Jobs

Measurement Technician

Targa Resources Inc
Midland, TX, United States

Ensuring oxygen stay with in dictated specifications Tracking down oxygen within the gathering lines. Assists with repairing and/or replacing faulty instruments, safety equipment and controls, and maintains ...

1 + Years Experience Maintenance Technician

Plant Operations Technician

Targa Resources Inc
Midland, TX, United States

Review and monitor plant operation/processes for optimizing quality and production of products meeting required data specifications, including but not limited to working safely and having good trouble ...

2 + Years Experience Plant Operations Engineer

I/E Supervisor

Targa Resources Inc
Midland, TX, United States

Supervise overall instrument and electrical systems including all preventive and predictive maintenance activities. Monitor instrument and electrical performance. Lead and direct I/E Technicians by scheduling ...

5 + Years Experience Electrical Technician Field Comm / SCADA Maintenance Manager

Plant Operations Technician

Targa Resources Inc
Midland, TX, United States

Review and monitor plant operation/processes for optimizing quality and production of products meeting required data specifications, including but not limited to working safely and having good trouble ...

2 + Years Experience Plant Operations Engineer

Heavy Diesel Mechanic - Crude Oil Tankers

Plains All American Pipeline
Midland, TX, United States

Responsible for maintenance and repairs on transport trucks, trailers and pickups. Participate in on-call rotation schedule. Ensure proper D.O.T., state inspection and insurance papers are included in ...

2 + Years Experience Mechanic Mechanical Technician

Tubing Tester (Midland)

Basic Energy Services Featured Employer Featured Employer
Midland, TX, United States

: Drives equipment to and from location Rigs up which includes hanging shiv at top of rig, feeding the winch line, and testing the seating nipple and first joint Pressures up testing tubes and reads gauges ...

2 + Years Experience Well Servicing & Testing

Bulk Plant Operator

Basic Energy Services Featured Employer Featured Employer
Midland, TX, United States

: Blend and mix all bulk products for delivery to the well site on time and as per the detailed design Orders products using the PO system Checks and/or calculates quantities of material blends required ...

0 + Years Experience Heavy Machinery Operator Refinery / Plant Operator

Area Manager - Snubbing (Odessa)

Basic Energy Services Featured Employer Featured Employer
Midland, TX, United States

include profit and loss accountability, employee management and development, sale of services, engineering maintenance, inventory, safety awareness and equipment management. This is a safety sensitive ...

2 + Years Experience Snubbing

I/E Technician

Targa Resources Inc
Midland, TX, United States

Responsible for supervising overall instrument and electrical systems. Monitor instrument and electrical performance Proactive approach to all preventive and predictive IE maintenance activities Learn ...

2 + Years Experience Electrical Technician Instrumentation Technician