LATEST JOB POSTINGSLATEST JOB POSTINGS

SORT BY sort by
  • Sort by Relevance
  • Sort by Date
1 - 20 of 87 Jobs

Scheduler Planner

Targa Resources Inc
Chico, TX, United States

Maintain Maximo Set up equipment; PM's; in Maximo; Run reports Print, distribute weekly planned weekly work orders Set up ESH PM's; Monitor Open Work Orders Run Business Objects reports as needed Enter ...

3 + Years Experience Planner / Scheduler

Trading Analyst

Targa Resources Inc
Houston, TX, United States

Review of contracts to include updating and changing deals based on contract updates. Daily pricing analysis, month end close pricing analysis, monthly OPIS price review. Maintains SOX compliance with ...

0 + Years Experience Energy / Commodity Trading

Maintenance Technician

Targa Resources Inc
Kermit, TX, United States

Performing PMs, diagnose, trouble-shoot, repair, and maintain overall proper function of the following types of equipment: High speed reciprocating compressors Low speed compressors, air compressors, ...

2 + Years Experience Maintenance Technician

Maintenance Technician

Targa Resources Inc
Crane, TX, United States

Performing PMs, diagnose, trouble-shoot, repair, and maintain overall proper function of the following types of equipment: High speed reciprocating compressors Low speed compressors, air compressors, ...

2 + Years Experience Maintenance Technician

Measurement Technician

Targa Resources Inc
Monument, NM, United States

AND ESSENTIAL DUTIES: Assists with repairing and/or replacing faulty instruments, safety equipment and controls, and maintains instruments and control equipment in a clean and workable conditionAudits ...

1 + Years Experience Maintenance Technician MWD / LWD

Lab Technician

Targa Resources Inc
Channelview, TX, United States

Conduct all job-related tasks in a timely, safe manner; comply with all governmental and corporate regulations (including site-specific procedures) related to occupational safety, employee health and ...

3 + Years Experience Laboratory Ops / Tech

Senior Internal Controls Analyst

Targa Resources Inc
Houston, TX, United States

Maintain the Sarbanes-Oxley (SOX 404) internal controls documentation repository currently in SharePoint; assist IT in administering access to the SOX Compliance site Work with process and control owners ...

3 + Years Experience Accounting

Measurement Technician

Targa Resources Inc
Eunice, NM, United States

AND ESSENTIAL DUTIES: Assists with repairing and/or replacing faulty instruments, safety equipment and controls, and maintains instruments and control equipment in a clean and workable conditionAudits ...

1 + Years Experience Inventory Control

Plant Administrator

Targa Resources Inc
Mont Belvieu, TX, United States

Answer telephones, greet visitors at lobby entrance, communicate with plant personnel via radio Responsible for general correspondence - reporting, general filing, scheduling meeting rooms, etc. Payroll ...

2 + Years Experience Refinery / Plant Operations Supervisor Refinery Staff

Plant Operations Developmental Technician

Targa Resources Inc
Atoka, OK, United States

Assists with the operating of natural gas plant and pipeline equipment including but not limited to treating plants, reciprocating natural gas compressors, dehydrators, fluid separation equipment, valves, ...

2 + Years Experience Plant Operations Engineer

Measurement Technician

Targa Resources Inc
Wink, TX, United States

AND ESSENTIAL DUTIES: Assist in the operation, calibration and troubleshooting of H2S monitors. Assist in locating and tracking H2S within the pipeline systemAssists in the installation, startup, and ...

1 + Years Experience Maintenance Technician

Measurement Technician

Targa Resources Inc
Venice, LA, United States

Learn and understand Targa's Safety Policies and Procedures and Business Ethics Policies. Plan and perform all assignments in a safe manner by utilizing the proper tools, safety and environmental precautions, ...

3 + Years Experience MWD / LWD

Analyzer Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Installation, maintenance and calibration of on stream gas chromatographs Installation, maintenance and calibration of various utility analyzers including conductivity, PH, moisture, 02, BTU and CO Maintain ...

1 + Years Experience Field Comm / SCADA

NGL Analyzer Technician

Targa Resources Inc
Odessa, TX, United States

Installation, maintenance and calibration of on stream gas chromatographs Installation, maintenance and calibration of various utility analyzers including conductivity, PH, moisture, 0 2 , BTU and CO ...

1 + Years Experience Field Comm / SCADA Maintenance Technician

CBF Maintenance Technician

Targa Resources Inc
Mont Belvieu, TX, United States

Completes basic and routine maintenance tasks in support of operations Conduct all job related tasks in a safe manner; comply with all governmental and corporate regulations (including site-specific procedures) ...

0 + Years Experience Maintenance Technician

I/E Technician

Targa Resources Inc
Venice, LA, United States

Learn and understand Targa's Safety Policies and Procedures and Business Ethics Policies. Plan and perform all assignments in a safe manner by utilizing the proper tools, safety and environmental precautions ...

1 + Years Experience Electrical Technician Instrumentation Technician Software Specialist

Design Drafter

Targa Resources Inc
Watford City, ND, United States

Create and maintain Piping & Instrument Diagrams 3D Piping Models Plot Plans & General Arrangement Drawings Minimum Essential Qualifications Minimum of 2 years of related work experience. Minimum High ...

2 + Years Experience Drafting

Plant Operations Technician

Targa Resources Inc
Stanton, TX, United States

Operation of cryogenics plant, stabilizer, amine and glycol treatment systems; Operating and performing minor maintenance on compressors; Collecting data readings and monitoring plant equipment; Truck ...

2 + Years Experience Plant Operations Engineer

Plant Operations Technician

Targa Resources Inc
Orla, TX, United States

Operation of cryogenics plant, stabilizer, amine and glycol treatment systems;Operating and performing minor maintenance on compressors;Collecting data readings and monitoring plant equipment;Truck loading ...

3 + Years Experience Plant Operations Engineer

Measurement Technician

Targa Resources Inc
Watford City, ND, United States

Assists with repairing and/or replacing faulty instruments, safety equipment and controls, and maintains instruments and control equipment in a clean and workable condition Audits meter stations for installation ...

1 + Years Experience Maintenance Technician MWD / LWD