The Senior Electrician is the designated "person in charge" to Supervise and carrying out repairs and maintenance to electrical equipment. Minimum Job Functions Includes, but is not limited ...
LATEST JOB POSTINGS
- Sort by Relevance✔
- Sort by Date
Senior Electrician
Sapura Drilling Services Sdn BhdKuala Lumpur, Malaysia
Barge Engineer
Sapura Drilling Services Sdn BhdKuala Lumpur, Malaysia
The Barge Engineer is the designated "person in charge" to assist the Offshore Installation Manager (OIM) in all Marine operations, including rig moves and rigs stability, Supply vessel operations, ...
Heavy Lift Crane Operator & Crane Operator
Sapura Drilling Services Sdn BhdKuala Lumpur, Malaysia
The Heavy Lift Crane Operator is the designated "person in charge" for all crane operations. His primary roles is to assist the Barge Engineer (Master) in all deck and marine operations in support ...
Offshore Installation Manager
Sapura Drilling Services Sdn BhdKuala Lumpur, Malaysia
The Offshore Installation Manager (OIM) is responsible for the day-to-day management, operation & maintenance of the offshore installation and in charge of the health, safety and welfare of persons on ...
Driller
Sapura Drilling Services Sdn BhdKuala Lumpur, Malaysia
The Driller is the designated "person in charge" of real time drilling operations ensuring the safety of the drill crew and support personnel working around the drill floor. This includes monitoring ...