Texon IDs O&G at Eagle Ford Well

Texon Petroleum has advised that the Tyler Ranch EFS #1H well has drilled into the Eagle Ford Shale at the depth of 3,252m (10,670ft) and has encountered good oil and gas shows.

The well will now drill 1,372m (4,500ft) laterally within the Eagle Ford at which time production casing will be run. Drilling and casing the well are anticipated to take 12 -14 days.

Hydraulic fracture stimulation and testing of the well are scheduled for early November.

Global has a 7.939% working interest (5.95% NRI) in the well.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Production Engineer
Expertise: Production Engineering
Location: Houston, TX
Senior Client / Program Manager
Expertise: Geologist|Reservoir Engineering
Location: Seattle, WA
Senior Sales Representative - Oil and Gas
Expertise: Corrosion Engineering|Petroleum Engineering|Sales
Location: Harvey, LA
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours