Equipment Defects Halt Drilling Ops on Sevan Driller

Defects in the riser tensioning systems (DAT cylinders) in the drilling package, have caused a stop in the drilling operation on the Sevan Driller since August 25, 2010. The supplier and the manufacturer of the cylinders have taken corrective actions and are working in close cooperation with Sevan to repair the equipment. During the period of repair, the rig is on zero dayrate. Sevan expects that the rig will be back in operation by end of September.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Maintenance Assistant
Expertise: Maintenance Technician
Location: Denton
 
Maintenance Electronics Technician
Expertise: Maintenance Technician
Location: Denton
 
Equipment Operator
Expertise: Cementing|Coil Tubing|Maintenance Technician
Location: El Reno
 
search for more jobs

Brent Crude Oil : $50.56/BBL 0.15%
Light Crude Oil : $47.7/BBL 0.70%
Natural Gas : $3.05/MMBtu 1.32%
Updated in last 24 hours