Black Dragon's EOR Technology Shows Positive Results

Black Dragon announced that Black Dragon's EOR technology has demonstrated positive results. According to EOR Principal, the Davis well was producing 4 barrels a day. They injected 1.100 barrels of water with the chemical and the well produced 150 barrels in 36 hours. That was the maximum volume the Davis well could pump. They feel by increasing the size of their pumping system, the well could produce 500 barrels a day. Dragon Management was also told that the Davis lease only shows 1/2 of the reserve of the Humble property. Again Dragon plans to have the fifth well drilled and be injecting the chemical before month end. The cost to purchase this patented steam injection equipment can be recovered in 150 barrels creating a nice ROI for the furnace and equipment necessary to increase Humble's production substantially.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
United States Odessa: Engineer - Frac/Acid
Expertise: Petroleum Engineering
Location: Odessa, TX
 
United States Houston: Senior Drilling Fluids Engineer
Expertise: Drilling Engineering
Location: Houston, TX
 
Region Leader - Field Development
Expertise: Field Development|Process Engineer|Subsea Engineering
Location: Houston
 
search for more jobs

Brent Crude Oil : $50.64/BBL 0.62%
Light Crude Oil : $48.04/BBL 1.47%
Natural Gas : $3.01/MMBtu 2.58%
Updated in last 24 hours