Gastem Notes Operations Underway at St. Hyacinthe Well

Gastem announced that the St. Hyacinthe HZ1A well on the 37,247 hectare Canbriam Energy/Gastem St-Hyacinthe Property has been spud. Planned Measured Depth of the well is 3,360 meters, with a lateral section of 1,000 meters, and should be reached in approximately three weeks.

The St. Hyacinthe HZ1A horizontal well is the final well of a four well continuous program composed of three horizontal wells and one vertical well on the St-Hyacinthe Property to be drilled and tested during 2010. Fracture completion of the well will be done as part of a program to stimulate all 3 horizontal wells following the drilling of this last horizontal well. Pipeline infrastructure is present on the property.

"The drill rig has moved from St. Barnabe, where the second horizontal well has been successfully drilled and cased, to the site of the St. Hyacinthe well," said Mr. Raymond Savoie, CEO of Gastem. "Once this drill program has been completed, all horizontal wells will be fracture stimulated and results will be made known as soon as available."

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Roustabout
Expertise: Floorhand / Roughneck|Roustabout
Location: Port Fourchon, LA
 
Store keeper / Warehouse - Zanesville Ohio - 6200
Expertise: Storeman|Supply Chain Management|Warehouse Person
Location: Zanesville, OH
 
Roustabout Thereafter Job
Expertise: Roustabout
Location: Silverthorne, CO
 
search for more jobs

Brent Crude Oil : $48.6/BBL 1.12%
Light Crude Oil : $46.34/BBL 1.24%
Natural Gas : $2.9/MMBtu 2.35%
Updated in last 24 hours