RWE Dea Awards EPC Contract to Heerema

RWE Dea UK awarded a contract to Heerema Vlissingen B.V. for the engineering, procurement and construction of a minimum facilities platform for the Breagh A development. Heerema Vlissingen B.V. will also construct a jacket, topsides and piles for the Clipper South development. The jacket will be about 131 feet (40 meters) tall with a total weight of 1,279 tons (1,160 tonnes); and the topsides will weigh approximately 2,205 tons (2,000 tonnes). Clipper South is expected to come online in the first quarter of 2012. The Clipper South gas field is located on UK Blocks 48/19c, 48/19a and 48/20a and straddles Production Licenses P008 and P465 in the Southern North Sea. RWE Dea serves as the operator and holds a 50% interest; Fairfield Acer Limited holds the remaining 50%.

continue reading about Breagh on SubseaIQ

continue reading the full article

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Environmental Geologist
Expertise: Chemical Engineering|Geologist
Location: Tacoma, WA
 
Electrical Start Up and Commissioning Manager
Expertise: Electrical Engineering
Location: Alvin, TX
 
Entry Level Hydrogeologist
Expertise: Chemical Engineering|Geologist
Location: Denver, CO
 
search for more jobs

Brent Crude Oil : $50.2/BBL 3.29%
Light Crude Oil : $47.89/BBL 3.34%
Natural Gas : $2.94/MMBtu 1.37%
Updated in last 24 hours