RWE Dea Awards EPC Contract to Heerema

RWE Dea UK awarded a contract to Heerema Vlissingen B.V. for the engineering, procurement and construction of a minimum facilities platform for the Breagh A development. Heerema Vlissingen B.V. will also construct a jacket, topsides and piles for the Clipper South development. The jacket will be about 131 feet (40 meters) tall with a total weight of 1,279 tons (1,160 tonnes); and the topsides will weigh approximately 2,205 tons (2,000 tonnes). Clipper South is expected to come online in the first quarter of 2012. The Clipper South gas field is located on UK Blocks 48/19c, 48/19a and 48/20a and straddles Production Licenses P008 and P465 in the Southern North Sea. RWE Dea serves as the operator and holds a 50% interest; Fairfield Acer Limited holds the remaining 50%.

continue reading about Breagh on SubseaIQ

continue reading the full article


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Piping Engineer
Expertise: Piping Engineer
Location: Long Beach, CA
Entry Level Civil / Environmental Engineer
Expertise: Civil Engineering|Environmental Engineer
Location: Portland, OR
Mechanical & Piping Designer, Intermediate / Senior
Expertise: Mechanical Engineering|Piping Engineer
Location: Minneapolis, MN
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours