Texon to Commence Drilling 7th Leighton Well

Texon has advised that the seventh Leighton well, Tyler Ranch #6, is scheduled to begin drilling next week. The well has a planned total depth of 2,743 meters (9,000 feet) and will take about 15 days to drill. The well will penetrate the Olmos reservoir at approximately 2,706 meters (8,880 feet), which is the same oil and gas reservoir as is producing in the first six (6) Leighton wells (Peeler #1, Tyler Ranch #1, #2, #3, #4 and #5). Tyler Ranch #6 is located 366 meters west of Tyler Ranch #3. 

If the wire line electric logs indicate producible oil and gas in the Olmos reservoir, the well will be completed as the seventh oil and gas producer from this zone. 

Global has a 15% working interest (11.25% net revenue interest) in the Leighton Project.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: WellSite Supervisor
Location: Houston, TX
Chief Mechanic (6th Gen Drillship)(Contract)
Expertise: Rig Mechanic
Location: Houma, LA
ET (Deepwater Drillship)
Expertise: Rig Electrician
Location: Houma, LA
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours