Texon to Commence Drilling 7th Leighton Well

Texon has advised that the seventh Leighton well, Tyler Ranch #6, is scheduled to begin drilling next week. The well has a planned total depth of 2,743 meters (9,000 feet) and will take about 15 days to drill. The well will penetrate the Olmos reservoir at approximately 2,706 meters (8,880 feet), which is the same oil and gas reservoir as is producing in the first six (6) Leighton wells (Peeler #1, Tyler Ranch #1, #2, #3, #4 and #5). Tyler Ranch #6 is located 366 meters west of Tyler Ranch #3. 

If the wire line electric logs indicate producible oil and gas in the Olmos reservoir, the well will be completed as the seventh oil and gas producer from this zone. 

Global has a 15% working interest (11.25% net revenue interest) in the Leighton Project.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Equipment Operator - San Antonio
Expertise: Coil Tubing|Driller|Production Operator
Location: San Antonio, TX
 
Frac Supervisor - TX, ND, WY & OK
Expertise: WellSite Supervisor
Location: El Reno, 
 
United States Bossier City: Service Supervisor I - Frac/Acid
Expertise: Field Service Tech|WellSite Supervisor
Location: Bossier City, LA
 
search for more jobs

Brent Crude Oil : $51.46/BBL 4.63%
Light Crude Oil : $48.9/BBL 4.78%
Natural Gas : $3.18/MMBtu 0.90%
Updated in last 24 hours