Dong to Carry Out Production Drilling at Trym Field

Maersk Giant
(Click to Enlarge)

The Petroleum Safety Authority Norway granted Dong E&P Norge AS consent to carry out production drilling on the Trym field using the Maersk Giant jackup. Trym's Plan for Development and Operation was approved in March 2010. According to the plan, the field will be developed by a subsea installation tied-back to the Harald facility on the Danish side of the border. The approved consent applies to the drilling of production wells, and according to Dong's application for consent, the drilling activity has an expected duration of 216 days. The Trym gas/condensate field is located in the far south of the North Sea, just 2 miles (3 kilometers) from the border of Denmark in a water depth of 213 feet (65 meters). DONG operates the field, holding a 50% interest.

continue reading the full article

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Landman - Permian Basin
Expertise: Landman
Location: Midland, TX
Lithium Metals Unit Leader
Expertise: Manufacturing Engineering|Operations Management|Production Testing
Location: Kings Mountain, NC
Reserves Assessment Engineer/Specialist
Expertise: Reservoir Engineering
Location: Houston, TX
search for more jobs

Brent Crude Oil : $49.71/BBL 1.50%
Light Crude Oil : $48.7/BBL 2.05%
Natural Gas : $3.11/MMBtu 12.68%
Updated in last 24 hours