Newfield Exploration Updates on Pipeline Damage Offshore Malaysia

An unidentified marine vessel has damaged an oil pipeline connecting the East Belumut platform to the Tinggi platform. Newfield Exploration, operator, has shut-in production from the oil field and the leak was isolated. The East Belumut field was producing about 20 Mbopd prior to shut-in. It should take approximately six to eight weeks to complete and return East Belumut to production. The field is located in license PM 323, about 160 miles (257 kilometers) offshore Peninsular Malaysia in 240 feet (73 meters) of water.

continue reading the full article

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Petroleum Inspection Manager
Expertise: Field Service Tech|Marine Surveying|Surveying
Location: New Orleans, LA
 
Fluids Plant Operator
Expertise: Maintenance Technician|Mud Engineer / Drilling Fluids|Refinery / Plant Operator
Location: Monahans, TX
 
Nitrogen Transport Driver
Expertise: Heavy Machinery Operator|Truck / HGV Driver
Location: Dayton, OH
 
search for more jobs

Brent Crude Oil : $56.86/BBL 0.76%
Light Crude Oil : $50.66/BBL 0.21%
Natural Gas : $2.959/MMBtu 0.30%
Updated in last 24 hours