Newfield Exploration Updates on Pipeline Damage Offshore Malaysia

An unidentified marine vessel has damaged an oil pipeline connecting the East Belumut platform to the Tinggi platform. Newfield Exploration, operator, has shut-in production from the oil field and the leak was isolated. The East Belumut field was producing about 20 Mbopd prior to shut-in. It should take approximately six to eight weeks to complete and return East Belumut to production. The field is located in license PM 323, about 160 miles (257 kilometers) offshore Peninsular Malaysia in 240 feet (73 meters) of water.

continue reading the full article


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Artificial Lift - Cable Technician
Expertise: Heavy Machinery Operator
Location: Midland
United States Odessa: Sr Field Engineer - Directional Drilling
Expertise: Directional Driller|Drilling Engineering
Location: Odessa, TX
Project Manager, Oil and Gas
Expertise: Petroleum Engineering|Project Management
Location: West Chicago, IL
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours