AWE Installs BOPs at Tui Field

AWE advised that during the week surface casing was set in Kahu-1 to a planned depth of 1504m. At 0600 hours (NZ time) BOP's were being installed prior to preparing to drill ahead. It is anticipated that top of the target reservoir should be intersected in the coming week.

The Kahu-1 well is an exploration well within PMP 38158, located approximately 3 kilometers east of the producing Tui oil field.
Kahu-1 will test the Kapuni group sands within a large incised valley feature immediately east of the Tui oil field. The well is being drilled in a water depth of 122 meters and is expected to drill to a total measured depth of approximately 3,820 meters.

Participants in Kahu-1 and PMP 38158 are:

  • AWE Limited (Operator) 42.5%
  • Mitsui E&P Australia Pty Limited 35.0%
  • Stewart Petroleum Co Limited (NZOG) 12.5%
  • WM Petroleum Limited (PPP) 10.0%

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Lithium Metals Unit Leader
Expertise: Manufacturing Engineering|Operations Management|Production Testing
Location: Kings Mountain, NC
Drilling Fluids Specialist
Expertise: Drilling Foreman / Drilling Supervisor
Location: Beeville
Reserves Assessment Engineer/Specialist
Expertise: Reservoir Engineering
Location: Houston, TX
search for more jobs

Brent Crude Oil : $49.71/BBL 1.50%
Light Crude Oil : $48.7/BBL 2.05%
Natural Gas : $3.11/MMBtu 12.68%
Updated in last 24 hours