Cubic Energy: La. Well Reaches TD

Cubic Energy announced that the Thomas 36 No. 1, which spud on April 29, 2010, has reached its total drilling depth and the production casing string has been set to 16,224 feet Total Measured Depth (TMD) which includes approximately a 4,250' horizontal section.

The Thomas 36 No. 1 is located in Section 36, Township 16 North - Range 15 West in Caddo Parish, Louisiana, located in Cubic's Johnson Branch acreage. Cubic has a 37% working interest in this well, and is the single largest working interest owner in the Thomas 36 No. 1.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Experienced Floorhand
Expertise: Floorhand / Roughneck
Location: Dickinson, ND
 
US Fort Lupton: Entry Level Technology Services Technician
Expertise: Production Engineering
Location: Fort Lupton, CO
 
Drill Rig Operator
Expertise: Directional Driller|Driller|Drilling Foreman / Drilling Supervisor
Location: Sand Springs, OK
 
search for more jobs

Brent Crude Oil : $50.97/BBL 1.53%
Light Crude Oil : $48.75/BBL 1.79%
Natural Gas : $2.92/MMBtu 0.68%
Updated in last 24 hours