Diaz Ramps Up Heavy Oil Production at Lloydminster

Diaz Resources provided an update on production from the three previously announced Lloydminster horizontal heavy oil wells, which were drilled in the first quarter of 2010.

The three wells, which started producing May 21, 2010, are currently averaging 170 Bopd combined (Diaz : 85 Bopd net).

The addition of the three Lloydminster wells increases Diaz's current net production to approximately 600 Boepd, comprising 30 % oil.

Diaz has a 50 % working interest in section 18-48-1 W4 which now has 7 producing horizontal oil wells.

Diaz plans to drill up to five more horizontal heavy oil wells in section 18-48-1 W4 in 2010.

 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Pressure Equipment Integrity Engineer
Expertise: Chemical Engineering|Mechanical Engineering|Process Engineer
Location: Norco, LA
 
United States Houston: Principal II - DES
Expertise: Design Engineer|Drilling Engineering
Location: Houston, TX
 
Sr Reservoir / Production Engineer - Field Engineering
Expertise: Production Engineering
Location: Platteville, CO
 
search for more jobs

Brent Crude Oil : $50.56/BBL 0.15%
Light Crude Oil : $47.7/BBL 0.70%
Natural Gas : $3.05/MMBtu 1.32%
Updated in last 24 hours