Gary #1-24H Well Reaches TD

Samson O&G advised that the Gary #1-24H well has been drilled to a measured depth of 11,645 feet and the 7 inch intermediate casing string has been run and cemented.

The well track has been drilled as designed and at this depth the well is horizontal and has intersected the Middle Bakken Formation slightly high to prognosis.

The Middle Bakken, when intersected, returned hydrocarbon shows which are consistent or slightly better than the Gene #1-20H well.

As at 0600 hours CST the rig was preparing to begin drilling the 5,700 foot horizontal section which will be cased utilizing external casing packers, prior to it being fracture stimulated.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Drilling Manager
Expertise: Drilling Manager|Drilling Superintendent
Location: Dallas, TX
 
Drill Rig Operator
Expertise: Driller|Drilling Foreman / Drilling Supervisor|Production Operator
Location: Hayward, CA
 
Lead Riser Engineer
Expertise: Project Engineer|Subsea Engineering|Umbilicals, Risers and Flowlines
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $56.86/BBL 0.76%
Light Crude Oil : $50.66/BBL 0.21%
Natural Gas : $2.959/MMBtu 0.30%
Updated in last 24 hours