Nido to Turn on Taps at Tindalo

The Aquamarine Driller jackup has completed tie-back operations and riser installations for the Tindalo-1 well offshore Philippines, announced Nido Petroleum. Prior to production testing of the well, the crude oil transfer hose will be connected to both the rig and the FSO, linking the crude production, delivery and storage systems. Final installation, hook up and pre-commissioning testing of the production equipment on board the rig will also be concluded. The field is expected to commence production some time in May 2010. Tindalo is located in the northeast quadrant of Service Contract 54, which is operated by Nido Petroleum.

continue reading about Tindalo/Yakal on SubseaIQ

continue reading the full article

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
United States Houston: Principal II - DES
Expertise: Design Engineer|Drilling Engineering
Location: Houston, TX
 
Sr Reservoir / Production Engineer - Field Engineering
Expertise: Production Engineering
Location: Platteville, CO
 
United States Rock Springs: Entry Level to Senior Engineer - Cased Hole
Expertise: Reservoir Engineering
Location: Rock Springs, WY
 
search for more jobs

Brent Crude Oil : $50.56/BBL 0.15%
Light Crude Oil : $47.7/BBL 0.70%
Natural Gas : $3.05/MMBtu 1.32%
Updated in last 24 hours