Ascent Concludes Sidetrack in Eastern Hungary

Ascent has completed the PEN-101 sidetrack, part of the Penészlek Project, in the Nyírség exploration permits of eastern Hungary. 

The PEN-101 sidetrack will produce gas from the Miocene tuffaceous gas formation, the target of which was defined by 3-D seismic in 2008. The well was originally drilled in February 2010 to a total depth of 1,500m, however during completion an acid stimulation treatment had broken through a repair to the cement isolation behind the steel casing and allowed water production from a deeper formation. The sidetrack was drilled to overcome this problem and the well has now been successfully completed and perforated, with gas flowed on a short test. Once the rig has been demobilized from the location, the PEN-101 well will be acidized and connected to the adjacent production facility where the PEN-105 gas is already processed

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Floorhand - Job Fair May 31st
Expertise: Floorhand / Roughneck
Location: New Iberia, LA
 
GOM Floorhand
Expertise: Floorhand / Roughneck
Location: New Iberia, LA
 
Drilling Floorhand, Motorhand & Derrickhand
Expertise: Derrickman|Floorhand / Roughneck|Motorman
Location: Greeley
 
search for more jobs

Brent Crude Oil : $53.87/BBL 0.48%
Light Crude Oil : $50.73/BBL 0.79%
Natural Gas : $3.33/MMBtu 2.14%
Updated in last 24 hours