AWE to Conduct Second DST at Yemeni Well

AWE reported that during the week, drill-stem testing (DST) continued over the interval 3,125 to 3,660 meters in the Al Meashar-1 well in Yemen.

At the end of this test, a production logging tool was run. Preliminary interpretation of this log indicates that oil flow was obtained from both above and within the basement section. Flow rates averaged approximately 400 barrels of oil and mud per day and periodically tested higher. The well did not clean up during this test.

The forward program is to carry out a second DST, covering the basement section only.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
U.S. Zanesville: Sr Field Engineer - Directional Drilling
Expertise: Directional Driller
Location: Zanesville, OH
 
United States Canonsburg: Service Manager
Expertise: Customer Service|WellSite Supervisor
Location: Canonsburg, PA
 
Drilling Engineer II Job
Expertise: Drilling Engineering|Petroleum Engineering
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $55.49/BBL 2.45%
Light Crude Oil : $52.42/BBL 2.04%
Natural Gas : $3.2/MMBtu 5.04%
Updated in last 24 hours