Empyrean Updates on Hercules Prospect



Empyrean Energy has been advised by the operator, Krescent Energy Company, that since reaching TD and running logs at the BP America A-740 #1 well, production casing has been run and a short test conducted. 

Following the short flow test, the well has been shut in, to be connected to a sales line. 

Following connection to the sales line, the well will be flowed for a longer period of time to determine stabilized flow rates and the possibility of having to perform stimulating operations on the well. 

A further announcement will be made once the well is connected to sales and stabilized rates have been achieved.


RELATED COMPANIES