Talisman Taps Technip for 2 Tie-Backs in UK North Sea

Technip has been awarded by Talisman Energy (UK) Limited two engineering, procurement and installation contracts, worth in excess of €40 million on a lump sum basis, for the development of the Auk North and Burghley fields. The fields will be tied back to Talisman's Fulmar A platform and the Premier Oil-operated Balmoral Floating Production Vessel respectively.

The Auk North contract covers the fabrication and installation of a production pipeline, the installation of an umbilical, a power cable and subsea equipment.

The Burghley contract covers fabrication and installation of a production pipeline and a gas lift pipeline, as well as the installation of an umbilical and subsea structures.

Both contracts include pre-commissioning and commissioning support.

Technip's operating center in Aberdeen, Scotland will execute the contracts, which are scheduled to commence in the field in the second quarter of 2010. The pipelines will be welded at Technip's spoolbase in Evanton, Scotland.

Two vessels from the Technip fleet will be used for the offshore installation campaign: the Orelia diving support vessel and the new pipelay vessel, Apache II.


 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Equipment Operator
Expertise: Cementing|Coil Tubing|Maintenance Technician
Location: El Reno
 
Account Manger - Levelland/Lubbock, TX Area
Expertise: Customer Service|Production Operator|Well Servicing & Testing
Location: Levelland, TX
 
Dispatcher
Expertise: Dispatcher
Location: Greeley, CO
 
search for more jobs

Brent Crude Oil : $50.56/BBL 0.15%
Light Crude Oil : $47.7/BBL 0.70%
Natural Gas : $3.05/MMBtu 1.32%
Updated in last 24 hours