Baker Hughes Helps Set Drilling Length Record in New Mexico

Baker Hughes recently completed a successful record-breaking run using the 4 3/4-in. AutoTrak™ eXpress™ rotary steerable system. Baker Hughes engineers suggested the system to an operator interested in drilling an extended-reach lateral in the Wildcat Wolfcamp Field of Chaves County, N.M. The combination of AutoTrak eXpress and the 4 3/4-in. Ultra X-treme™ LS modular motor provides the capability to stay within the zone while completing the planned 4,000-ft (1219-m) lateral. This bottomhole assembly drilled 4,092 ft (1247 m), completing the lateral in a single run and saving the operator several days of rig time, unnecessary trips, non-productive time and associated costs. It also helped set a Baker Hughes U.S. Land run-time record of 193 hours (total) with the AutoTrak eXpress system.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Field Inventory Technician
Expertise: Field Service Tech
Location: Midland, TX
 
Wireline Operators.
Expertise: Wireline
Location: Midland, TX
 
Maintenance and Electrical Tech
Expertise: Field Service Tech
Location: Denton, TX
 
search for more jobs

Brent Crude Oil : $50.64/BBL 0.62%
Light Crude Oil : $48.04/BBL 1.47%
Natural Gas : $3.01/MMBtu 2.58%
Updated in last 24 hours