Origin Prepares to Sidetrack Rockhopper-1 in Bass Basin

Origin Energy, on behalf of the T/18P Joint Venture, advised that on Thursday, January 7, 2010, the current operation at Rockhopper-1 is preparing to sidetrack the Rockhopper-1 well. Since the last report wireline logging operations have been completed and the well plugged below the kick-off point.

The sidetrack is designed to appraise the hydrocarbons encountered to date by intersecting the main reservoir sections approximately 1.3 kilometers south and down-dip from their penetration in Rockhopper-1, to assist in assessing the volume of oil and gas discovered in Rockhopper-1. It is anticipated that the sidetrack will take approximately 2 weeks to reach the primary reservoir section and a further 2 weeks to complete data acquisition and plugging and abandoning of the sidetrack and Rockhopper-1.
 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Packer
Expertise: Storeman|Warehouse Person
Location: Lovell
 
Drivers
Expertise: Heavy Machinery Operator|Rig Mover|Truck / HGV Driver
Location: Midland, TX
 
Class A CDL Drivers INTERVIEW OPPORTUNITY
Expertise: Motorman
Location: San Antonio, TX
 
search for more jobs

Brent Crude Oil : $50.56/BBL 0.15%
Light Crude Oil : $47.7/BBL 0.70%
Natural Gas : $3.05/MMBtu 1.32%
Updated in last 24 hours