PanTerra Increases Production in Alberta

PanTerra reported that as a result of field operations at its Gadsby, Alberta property, production has increased by two and a half fold to approximately 250 Mcf per day, bringing acquisition and work-over metrics down to $540 per flowing Mcf or $3,240 per flowing BOE. Further up-hole perforations and stimulations are planned.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Production Engineer I Job
Expertise: Petroleum Engineering|Production Engineering
Location: Oklahoma City, OK
 
MPD Field Engineer
Expertise: Drilling Foreman / Drilling Supervisor|Petroleum Engineering|WellSite Supervisor
Location: Houston, TX
 
Engineering Manager
Expertise: Engineering Manager|Production Engineering
Location: Fort Worth, TX
 
search for more jobs

Brent Crude Oil : $49.7/BBL 1.76%
Light Crude Oil : $47.12/BBL 1.55%
Natural Gas : $3.07/MMBtu 0.58%
Updated in last 24 hours