PanTerra Increases Production in Alberta

PanTerra reported that as a result of field operations at its Gadsby, Alberta property, production has increased by two and a half fold to approximately 250 Mcf per day, bringing acquisition and work-over metrics down to $540 per flowing Mcf or $3,240 per flowing BOE. Further up-hole perforations and stimulations are planned.

Related Companies

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Production Engineer
Expertise: Production Engineering
Location: Houston, TX
Senior Client / Program Manager
Expertise: Geologist|Reservoir Engineering
Location: Seattle, WA
Senior Sales Representative - Oil and Gas
Expertise: Corrosion Engineering|Petroleum Engineering|Sales
Location: Harvey, LA
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours