C & C Completes Perdido Jumper Surveys


Perdido Project
(Click to Enlarge)

C & C Technologies, Inc. (C & C) has completed metrology services for the Perdido oil and gas export line tie-in jumpers.

C & C's Marine Construction Division provided both the offshore acoustic metrology measurements and the dimensional control performed in the fabrication yard.

C & C utilized Sonardyne MK-V Wideband Compatts, which use advanced digital signaling techniques to improve the performance and stability of the acoustic metrology system. The oil jumper measured approximately 183 feet, making this one of the longest jumper metrology projects ever executed.

This marks the sixty-second metrology project performed by C & C in the deepwater of the Gulf of Mexico since June 2007.

With more than 600 employees worldwide, C & C provides a variety of survey services including globally-corrected GPS services, marine construction surveys, high-resolution geophysical surveys, geotechnical laboratory testing, and land surveys.
 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
U.S. Zanesville: Surface Solutions Service Operator I - Service Operator II
Expertise: Field Service Tech
Location: Zanesville, OH
 
U.S. Zanesville: Field Professional I - II MWD
Expertise: MWD / LWD
Location: Zanesville, OH
 
United States Bossier City: Field Service Rep. I - Drilling Fluids
Expertise: Mud Engineer / Drilling Fluids
Location: Bossier City, LA
 
search for more jobs

Brent Crude Oil : $53.92/BBL 2.79%
Light Crude Oil : $51.08/BBL 2.66%
Natural Gas : $3.3/MMBtu 3.22%
Updated in last 24 hours