Australian JV to P&A Planet Downs 1 Exploration Well


ATP 539
(Click to Enlarge)

Drillsearch reported that the Planet Downs-1 exploration well was plugged and abandoned on March 7, 2009 after encountering encouraging oil shows in the Murta, Westbourne and basal-Birkhead Formations and the Hutton sandstone. Although wireline logs confirmed probable oil in several zones, pressure and sidewall core data indicated poor permeability and limited column height. Participants in the well elected not to conduct any further tests and agreed to plug and abandon the well.

The exploration well, Planet Downs-1, reached its total depth of 1444 m on March 2, 2009. Because of lost circulation problems within the Hutton sandstone the well was not drilled to the planned total depth of 1880m, having already tested the primary basal-Birkhead Formations and Hutton sandstone objectives. The well was targeting oil trapped in a four-way dip-closed sub-culmination located along the structural axis of the Curalle Anticline.

The ATP539P Joint Venture parties are encouraged by the oil shows encountered in the Planet Downs-1 well and shall review the well results before deciding on future activity in the permit, which is likely to consist of further seismic acquisition to begin with.
 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
CDL Class A Driver
Expertise: Motorman|Truck / HGV Driver
Location: Midland, TX
 
Rig Mechanic Senior
Expertise: Rig Mechanic|Rig Welder
Location: Beggs, OK
 
Plug and Abandonment Rigger-Offshore
Expertise: Rig Instrument Tech
Location: Houma, LA
 
search for more jobs

Brent Crude Oil : $50.75/BBL 0.09%
Light Crude Oil : $47.73/BBL 0.50%
Natural Gas : $3.05/MMBtu 0.97%
Updated in last 24 hours