Songa Venus Settles in Offshore Australia, MEO Spuds Zeus-1


Songa Venus
(Click to Enlarge)

Zeus-1 Well
(Click to Enlarge)

MEO advised that the Songa Venus semisubmersible drilling rig arrived at the Zeus-1 location on Friday and commenced drilling on Saturday, Jan. 17. Zeus-1 is situated on the WA 361P permit in the Carnarvon basin off Western Australia.

Zeus-1 is a complex structural/stratigraphic play estimated to contain 15 Tcf potential gas-in-place in the Legendre Sandstones (primary target), and 3.7 Tcf potential gas-in-place in the overlying Forrestier Sandstones (secondary target).

Resource Development International Limited (RDI) is paying 80% of the well costs to a cap of US $31.25 million to earn a 35% interest in WA-361-P. In the event Zeus-1 discovers hydrocarbons, RDI will pay for MEO's share of two additional wells in the permit.
 

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Drilling Manager
Expertise: Drilling Manager|Drilling Superintendent
Location: Dallas, TX
 
Drill Rig Operator
Expertise: Driller|Drilling Foreman / Drilling Supervisor|Production Operator
Location: Hayward, CA
 
Tool Pusher
Expertise: Field Service Tech|Toolpusher
Location: Odessa, TX
 
search for more jobs

Brent Crude Oil : $56.86/BBL 0.76%
Light Crude Oil : $50.66/BBL 0.21%
Natural Gas : $2.959/MMBtu 0.30%
Updated in last 24 hours