Talisman to Drill Sidetrack Well with Gyda Platform Rig

(Click to Enlarge)

Talisman Energy Norge AS has received consent to conduct exploration drilling of well 2/1-14S from the Gyda platform rig.

Gyda belongs to production license 019B. Start-up of drilling on Gyda will be in December 2008. The well will be drilled as a sidetrack from well 2/1-A-22.

If a discovery is made, well 2/1-14S will become an oil producer.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Lithium Metals Unit Leader
Expertise: Production Technologist|Production Testing|Safety Engineering
Location: Kings Mountain, NC
Drilling Fluids Specialist
Expertise: Drilling Foreman / Drilling Supervisor
Location: Beeville
Reserves Assessment Engineer/Specialist
Expertise: Reservoir Engineering
Location: Houston, TX
search for more jobs

Brent Crude Oil : $50.47/BBL 0.98%
Light Crude Oil : $49.72/BBL 1.09%
Natural Gas : $2.76/MMBtu 1.09%
Updated in last 24 hours