Talisman to Drill Sidetrack Well with Gyda Platform Rig


Gyda
(Click to Enlarge)

Talisman Energy Norge AS has received consent to conduct exploration drilling of well 2/1-14S from the Gyda platform rig.

Gyda belongs to production license 019B. Start-up of drilling on Gyda will be in December 2008. The well will be drilled as a sidetrack from well 2/1-A-22.

If a discovery is made, well 2/1-14S will become an oil producer.
 

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Drilling Manager
Expertise: Drilling Manager|Drilling Superintendent
Location: Dallas, TX
 
Drill Rig Operator
Expertise: Driller|Drilling Foreman / Drilling Supervisor|Production Operator
Location: Hayward, CA
 
Lead Riser Engineer
Expertise: Project Engineer|Subsea Engineering|Umbilicals, Risers and Flowlines
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $56.86/BBL 0.76%
Light Crude Oil : $50.66/BBL 0.21%
Natural Gas : $2.959/MMBtu 0.30%
Updated in last 24 hours