Drilling Commences at Yousefieh-1 in Syria's Block 26


Block 26, Syria
(Click to Enlarge)

Gulfsands Petroleum has announced that drilling operations have commenced on the Yousefieh-1 exploration well in Block 26. The Yousefieh-1 well is planned to be drilled to a total vertical depth of approximately 2300 meters, and will target Cretaceous aged reservoirs identified within a structure located immediately adjacent
to the Khurbet East Oil Field.

The well is designed to evaluate the potential of a newly identified play type within the Cretaceous reservoir system.

The Yousefieh-1 well is located very close to existing infrastructure, with the surface location of the well lying within 3 kilometers of the Khurbet East Early Production Facility (EPF). The Company expects that drilling operations will be completed within 45 days.

 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Production Control Coordinator
Expertise: Production Engineering
Location: Houston, TX
 
Drill Rig Operator
Expertise: Driller
Location: Harvey, LA
 
Field Service Rep. III - Drilling Fluids
Expertise: Driller
Location: Zanesville, OH
 
search for more jobs

Brent Crude Oil : $53.87/BBL 0.48%
Light Crude Oil : $50.73/BBL 0.79%
Natural Gas : $3.33/MMBtu 2.14%
Updated in last 24 hours