Drilling Commences at Yousefieh-1 in Syria's Block 26

Block 26, Syria
(Click to Enlarge)

Gulfsands Petroleum has announced that drilling operations have commenced on the Yousefieh-1 exploration well in Block 26. The Yousefieh-1 well is planned to be drilled to a total vertical depth of approximately 2300 meters, and will target Cretaceous aged reservoirs identified within a structure located immediately adjacent
to the Khurbet East Oil Field.

The well is designed to evaluate the potential of a newly identified play type within the Cretaceous reservoir system.

The Yousefieh-1 well is located very close to existing infrastructure, with the surface location of the well lying within 3 kilometers of the Khurbet East Early Production Facility (EPF). The Company expects that drilling operations will be completed within 45 days.



Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Field Maintenance Controls Technician
Expertise: Maintenance Technician|Rig Mechanic
Location: Eighty Four, PA
Maintenance Supervisor - Drilling
Expertise: Maintenance Manager|Rig Mechanic
Location: Eighty Four, PA
Whipstock Welder
Expertise: Rig Welder|Welding|Workshop
Location: Lafayette, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours