Jura Spuds Kandra Well in Pakistan


Jura's Assets in Pakistan
(Click to Enlarge)

Jura Energy Corporation reported that the drilling of the Kandra 4D well commenced on August 16, 2008 at 11:30 am local time. The target depth of the well is 2,350 meters, which will allow for the evaluation of three separate geological horizons that have been identified as prospective hydrocarbon bearing formations.

The Kandra 4D well is the first of nine committed exploration wells in the joint venture's exploration program. Following the Kandra 4D well, it is expected that the rig will be mobilized to the Badin IV North block for the drilling of the Jamali Deep target.

Multiple leads have also been identified in the Badin IV South, Salam, and Mirpur Mathelo Blocks, with plans to finalize drilling locations and drill an additional two wells in Badin IV North, four wells in Badin IV South, one well in Salam, and one well in Mirpur Mathelo.
 

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Completions Supervisor Job
Expertise: Petroleum Engineering|Production Engineering|Workover or Completion
Location: Houston, TX
 
Production Engineer I Job
Expertise: Production Engineering
Location: Carlsbad, MN
 
Reservoir Engineer II Job
Expertise: Petroleum Engineering|Reservoir Engineering
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $53.96/BBL 0.35%
Light Crude Oil : $51.36/BBL 0.21%
Natural Gas : $3.209/MMBtu 0.34%
Updated in last 24 hours