Golden Gate's Key Drilling Rig 88 to Hit Bullseye in August

Pantheon Resources has been advised by the Operator, Golden Gate Petroleum Limited, that the Key Drilling Rig # 88 has been delayed arriving on location at the Bullseye Prospect, located in Iberville Parish, Louisiana, until August 1, when drilling will resume.

It is estimated to take approximately 3 days to drill to the primary Miogyp objective.

Pantheon is participating with a 15% working interest prior to back-in rights. Should back-in occur, Pantheon will participate with an 11.25% working interest.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
United States Duncan MFG: Entry Level Electrical Assembler - Sr. Electrical
Expertise: Electrical Technician
Location: Duncan, OK
Static Equipment / LNG Tank Engineer
Expertise: Mechanical Engineering
Location: Houston, TX
ARAMCO QM20 Third Party Inspector
Expertise: Electrical Engineering|QA / QC / Inspection|Technical Writing
Location: Bolingbrook, IL
search for more jobs

Brent Crude Oil : $51.46/BBL 0.61%
Light Crude Oil : $50.52/BBL 0.64%
Natural Gas : $2.83/MMBtu 5.35%
Updated in last 24 hours