Marley-2 Drilling Ahead

Tap Oil reports that the Marley-2 exploration well which was spud on April 22nd by the ENSCO 106 is currently at 2,642 mTVD. Drilling will continue to the programmed next section depth of approximately 2,955 mTVD.

The well is located in permit TL/5, part of the Harriet Joint Venture, within the Barrow sub-basin. It is approximately 3.5 kilometers westsouthwest of the existing Campbell Platform and 143 meters north of Marley-1. Water depth is 43 meters.

Marley-2 is a vertical exploration well designed to test the Jurassic sandstones that were not reached by the Marley-1 well, drilled December 2005 / January 2006. Drilling is estimated to take approximately 35 days to reach the expected total depth of 4,100 meters subsea.

Marley-2 is adjacent to existing joint venture infrastructure and is a high impact well, with the potential to more than double Tap's reserves.

TL/5 Joint Venture participants are Tap (Harriet) Pty Ltd. with 12.2229%; Apache Northwest Pty Ltd with 68.5% and Kufpec Australia Pty Ltd with 19.2771%.
Related Companies
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
United States Sonora: Operator, Plant-Multi-Chem, I
Expertise: Geoscience Technician
Location: Sonora, TX
United States Sonora: Operator, Plant-Multi-Chem, I
Expertise: Geochemist
Location: Sonora, TX
Senior Client / Program Manager
Expertise: Geologist|Reservoir Engineering
Location: Seattle, WA
search for more jobs

Brent Crude Oil : $50.79/BBL 1.30%
Light Crude Oil : $49.96/BBL 1.10%
Natural Gas : $2.77/MMBtu 2.12%
Updated in last 24 hours