El Nino Ventures Drill Program Underway In DRC

El Nino Ventures Inc. announced that their 2008, 25,000 meter drill program is underway in the DRC.

The company will drill a minimum of 25,000 meters over the next 5 months. The Company will do a minimum of 12,500 meters of RC drilling and 12,500 meters of Diamond Drilling. On April 12, 2008 the first RC drill rig started drilling the high grade copper zone where the company reported 3.5% Cu over ten meters in its initial drill program.

On May 1, 2008 two more drill rigs will be in operation. One of the drill rigs will be a diamond drill and this rig will focus on the copper showing now being drilled with the first RC rig and drill test the full length of the anomaly which runs just over 3 kilometers. When that drill rig is in operation the RC drill rigs will drill test 4 other areas of interest which have yet to be drill tested. These areas are located on our land position.

Mr. Allan Lines, our Exploration Manager, has prepared the 2008 exploration and drill program in conjunction with Caracle Creek International Consulting Inc. (CCIC). CCIC was retained by El Nino to review all the technical data and from that review the 2008 exploration program has been developed.

On our new acquisition announced in February 2008, airborne geophysics will be flown in the very near term, geochemical sampling will be carried out and later on in the season and we expect to drill test this permit.

Jean Luc Roy, President of El Nino states, "The dry season in the DRC is upon us and I am very pleased to announce the start of our extensive exploration and drilling program for 2008. We will follow up on promising results already obtained and we look forward to drill test other areas that show strong indicators on our permits. We are embarking on a very ambitious program and we will keep everyone up-to-date on the progress of our efforts in the DRC."


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: WellSite Supervisor
Location: Houston, TX
Chief Mechanic (6th Gen Drillship)(Contract)
Expertise: Rig Mechanic
Location: Houma, LA
ET (Deepwater Drillship)
Expertise: Rig Electrician
Location: Houma, LA
search for more jobs

Brent Crude Oil : $50.79/BBL 1.30%
Light Crude Oil : $49.96/BBL 1.10%
Natural Gas : $2.77/MMBtu 2.12%
Updated in last 24 hours