Awilco Takes Delivery of WilForce

Awilco Offshore has taken delivery of its fifth Ultra Premium jackup drilling rig. The rig has been delivered from PPL Shipyard in Singapore.

WilForce is of the Baker Marine Class 375, capable of drilling in water depths of up to 375 feet and to drill high pressure and high temperature wells down to 30,000 feet drilling depth.

In January 2008 WilForce was awarded a Notice of Tender Award from Repsol Exploration Murzuq S.A. After completion of operational preparation the rig will be delivered to Repsol for commencement of its 5 months work offshore Libya.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Static Equipment / LNG Tank Engineer
Expertise: Mechanical Engineering
Location: Houston, TX
ARAMCO QM20 Third Party Inspector
Expertise: Electrical Engineering|QA / QC / Inspection|Technical Writing
Location: Bolingbrook, IL
Power Generation Technician
Expertise: Electrical Technician|Electrician|Maintenance Technician
Location: Broussard, LA
search for more jobs

Brent Crude Oil : $51.46/BBL 0.61%
Light Crude Oil : $50.52/BBL 0.64%
Natural Gas : $2.83/MMBtu 5.35%
Updated in last 24 hours