Innamincka 'Drilling Ahead' at Yarrow North 1



Innamincka Petroleum advises that the Yarrow North 1 exploration well was at a depth of 1762 m. Current operations are drilling ahead 8 1/2-in. hole in the Namur Sandstone.

The well is prognosed to reach a total depth of 2770 metres over an operational period of 23 days.


RELATED COMPANIES