New Production Facility Commissioned at Kumkol Field in Kazakhstan

Turgai Petroleum, a joint venture with the equal interests of LUKOIL Overseas and PetroKazakhstan (part of CNPC group) commissioned a new modular water injection pump station at the Kumkol field in the Kyzylorda Region of Kazakhstan.

The construction of the station, the assembly and the start-up of equipment has lasted for 10 months. The investments totaled $7.2 million. The capacity of the water injection station is 12 thousand cubic meters per day. The station operates in the same processing chain with the previously commissioned initial water separation unit and uses the oilfield water separated at the unit.

The new facility commissioning was provided by the long-term development strategy of the company and solves the important task of formation pressure maintenance and improvement of the oil recovery factor on producing wells in the southern part of Turgai Petroleum's contract area.

In 2007, the production volume of Turgai Petroleum totaled 3.5 million tons of oil and 145 million cubic meters of gas.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Senior Field Operator-Gun Loading Supervisor
Expertise: Field Service Tech
Location: Odessa, TX
 
Principal Technical Professional
Expertise: Cementing|Production Engineering
Location: Houston, TX
 
United States Canonsburg: Cementing Technical Professional
Expertise: Cementing
Location: Canonsburg, PA
 
search for more jobs

Brent Crude Oil : $53/BBL 1.72%
Light Crude Oil : $49.77/BBL 2.27%
Natural Gas : $3.6/MMBtu 1.09%
Updated in last 24 hours