Pompano Well #1 Spudded

Pompano Project
(Click to Enlarge)

The operator of the Pompano Project, AnaTexas Offshore Inc., has advised that Well SL 103229 #1 spudded at 15:30hrs on Saturday, Jan. 12, 2008 (US/CST). At the time of the Operator's report at 06:00 hours on Jan. 13, 2008 (US/CST), Well #1 had been drilled to a depth of 808 feet below the rotary table on the rig floor and a short wiper trip was being undertaken prior to pulling out of the hole to run and cement the 16" casing string. Drilling was done by the Hercules 152 jackup rig.

The Participants in Well #1 and their respective working interests are Elixir Petroleum Ltd with 25%, Buccaneer Energy Ltd with 65%, Baron Petroleum Inc. with 7.5%, and Streamline Exploration Inc. with 2.5%.

Elixir's 25% working interest in Well #1 will be reduced by 5.0% pursuant to a 'back-in' arrangement with AnaTexas once Elixir has recouped its total investment in the well, plus 20%.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: Drilling Consultant|MWD / LWD|Well Control
Location: Houston, TX
Expertise: Drilling Superintendent
Location: Oklahoma, United States, OK
Field Service Technician - Warrior
Expertise: Maintenance Technician|Rig Mechanic
Location: Springtown, TX
search for more jobs

Brent Crude Oil : $51.38/BBL 2.44%
Light Crude Oil : $50.43/BBL 2.26%
Natural Gas : $3.14/MMBtu 0.94%
Updated in last 24 hours